Mar Monte Hotel | Waterfront Construction Almost Complete!

Renovations are underway at what will soon be known as the Hyatt Mar Monte. As this project nears the end of the construction phase, the CJM::LA continues to oversee the revitalization of this historic hotel with Young Construction and Steve Hanson Landscaping.  This project combines layered textural plantings with historic Spanish Colonial detailing, ensuring a natural cohesion with the Santa Barbara waterfront.

demolition of the existing parking lot and impermeable brick paving

converting the existing parking lot into a pedestrian promenade and lobby placita

decorative columns taking shape!

framing the fountain

setting the mediterranean fan palm in place at the pool deck

converting the existing pool deck into a lush paradise

careful restoration of the original hotel entry

putting the finishing touches on our lobby placita fountain. tile provided by NS Ceramic.

 

Comments are closed.